12 Shenyang Railway lines gradually resume service

Liaoning railway emergency repairs are speeding up the restoration of transportation, and Shenyang railway departments are inspecting and addressing multiple water damage hazards Check train updates in real time on 12306, reduce travel delays, and travel with peace of mind as soon as possible

Recent continuous rainfall in Liaoning has affected railway transportation. The Shenyang railway department organized repair crews to work continuously for more than 70 hours, focusing on inspecting and addressing multiple floodrelated hazards. Reports show that the emergency repair teams from the Shenyang Public Works Section cleared landslides, fallen trees, and mud buildup on key lines such as the Shenji Railway, and carried out fullcoverage inspections on more than 40 major lines including the Jingha, Shenhan, Shenda, and Shenji lines. They also promptly cleared drainage facilities and removed hazardous trees in order to restore line traffic conditions as soon as possible. As of 4:00 a.m. on July 15, passenger trains on 12 lines including Jingha, Xintong, Kaqi, Shenda, Chaoling, Panying, Changbai, Shenhan, Shendan, Changhui, Shenbai, and Danda had gradually resumed service. The railway department reminds passengers to check ticket information in a timely manner through the 12306 official website or mobile app to avoid delaying their trips.